Post 2 |
|
||
Lined the 3' hole with roofing paper and dumped some wet rocks in to hold it in place. |
Filled it with concrete and inserted a barbed PVC anchor. Will gently spill some water on it now and then over the next couple of days. |
|
|
||
Bored a hole up the post and temporarily placed it over the PVC. Still needs its aluminum foot and a total linseed oiling, 50/50. |
There it is, 2nd in line on the right. |
|