| 
   Lined
  this shallow hole with a scrap of roofing paper & a piece of cardboard.
  Wet it thoroughly and scooped in some concrete. 
   | 
  
   This
  was another that I thought totally unimportant, structurally, so I didn't
  even bother to put a PVC anchor into it. 
   | 
  
   This
  concrete footing is only about 4 or 5” deep though it is permanently bonded
  to bedrock. 
    
   | 
 
 
  | 
   I later
  regretted not having an anchor; it would have been helpful having something
  hold the post in position as I aligned the framing and attached it. 
  Perhaps
  I could have also skipped the concrete and just stood the post on the exposed
  bedrock, but the bedrock in this particular spot was fairly loose; I think
  the post would have eaten away at it, even with a rubber foot (see examples
  in 
Posts 14 to 17
). 
    
      |