Building A Shed |
![]() |
![]() |
![]() |
|
| 05/11/06: almost 10 weeks into the job |
|||
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
| Priming the cove moulding to 'finish' the soffits |
May 19, 2006 | ||
![]() |
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
| Cutting the dormer door | Glueing, screwing and clamping a hinge board to the wall-to-be |
||
![]() |
![]() |
![]() |
|
| The heavy weight counteracts a small warp in the plywood |
Attaching a track for the sliding door |
![]() |
![]() |
![]() |
||
| Thin wooden strips widen the track so the door will slide easy |
Various perspectives of the dormer wall |
|||
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
| This cable system lifts the hinged wall up and out of the way |
The cable connects to the smaller eye bolt Click on the image to read more |
![]() |
|
March 5 to June 3: 13 weeks from start to finish |
![]() |
![]() |
![]() |
![]() |
|
| West wall |
North wall | East wall | South wall |
![]() |
The end |
|
|