The Interior



Short version:

11/20/01

05/25/02


See next year ...


How it was done:

11/20/01

11/20/01

11/29/01

11/28/01

11/28/01 to 05/25/02

03/19/02


12/19/01
Looking towards the rear of the bedroom

Closets, cabinets, built-in bed and trunk were removed.
3 bedroom shots merged into a panoramic:

12/19/01

The next few months went into installing a water system and clearing a new site.

The interior renovation began with
The Floor (series)

03/13/02 to 05/23/02

The livingroom from outside the picture window opening:


A 4 shot panorama ... 04/28/02

normal          <--- select a size --->          large

So who manufactured the original plywood?

Replacing the rotted bedroom floor also served to shore up the rear so that it no longer sagged.

Then I went to work on the exterior.

When that was done, I returned to begin cleaning, scraping and sanding the floor, walls and ceiling.

05/10/02

Another panoramic of the bedroom

The right side

Closer to the front

Doorway with screen
and pocket removed

The bedroom as seen from its doorway:
A composite of 13 shots
small normal large

Next to the doorway, a wheel well under the partition and old heater vents.

In the livingroom-kitchen, the top of the partition with its door removed.



These shots of 05/25/02 were taken the morning of my departure

The livingroom as seen from the bedroom
normal       large


I left the place looking as though it were being lived in and I just might be right back

Each of the following, copied from the main Rejuvenation page, contain additional shots of the interior

Series: Foaming

Series: The Windows

Series: The Door

Series: The Escape Hatch

Series: Canvas Corners

Series: The Vents